Package Contents Description


  1. The installation program
  2. A video showing how to install
  3. A video with additional details
Notice: file not uploaded yet

  1. Email us right away
  2. We will re-upload the files within 1 day
  3. We will email you when the new download is ready

Installation steps sequence diagram

About ETAP 20 Download

This page provides ETAP 20 Download, the electrical CAD and documentation suite by ETAP, in a complete install-ready package. Whether you are rebuilding an engineering station or setting up a fresh commissioning laptop, follow the guide below and you will be up and running in minutes.

Key Capabilities of ETAP 20 Download

  • PLC connection planning and I/O assignment
  • Cable and harness documentation
  • Automatic generation of panel layouts and BOM
  • Schematic design with automatic wire numbering
  • Revision control and project-wide change tracking
  • Standards-compliant drawing frames and title blocks

System Requirements

  • Windows 10/11 64-bit
  • 8 GB RAM minimum, 16 GB for large projects
  • 10 GB free disk space
  • Multi-monitor setup recommended for schematics

Installation Notes

  1. Reboot the PC once after installation completes — this finalizes driver and service registration.
  2. If a controller or robot connection will be used, allow the software through the Windows firewall when prompted.
  3. Launch the application once with administrator rights so it can register its components before first normal use.
  4. After installation, re-enable antivirus protection and add the program folder to the allowed list if your policy requires it.
  5. Extract the downloaded archive with the password shown at the bottom of this page, using a recent version of WinRAR or 7-Zip.

Frequently Asked Questions

Can I import from other ECAD tools?
Yes, common exchange formats are supported; expect some manual cleanup of symbols and device data on first import.

Does it generate manufacturing documents?
BOM, cable lists, terminal plans and panel layouts are generated directly from the schematics.

How are revisions handled?
Revision control tracks changes per page and device, so updates stay traceable.

Is multi-user editing possible?
Projects can split into page-based work for parallel editing; coordinate access with your team.

Sequence
Section divider line

If you have problems installing, email us.
We can help you remotely and fix the problems.

Section divider line

Installation steps sequence diagram

Tips from Real Projects

A thirty-unit panel series built from ETAP 20 as the single source of truth shipped with zero wiring discrepancies. What worked: every recurring circuit stored as a macro with variants, and a nightly PDF snapshot archived automatically. Lock macro versions per project — a mid-build library update rippling through released pages is a weekend nobody gets back.

Files are delivered on our partner site up-der.com — a free account is required for some downloads.


WinRAR Download