Can’t find the software you need?
Email us.
We’ll send it to you.


➤ Before You Install

Before you install, set up your computer.

①If you have antivirus, remove it. Turn off the firewall.
②Restart your computer.

Section divider line

➤ Step1 ✱✱ Install

Run Setup.exe as administrator to install it.

Section divider line

Installation steps sequence diagram

About Nachi Robots FD on Desk II Download

Nachi Robots FD on Desk II Download from Nachi-Fujikoshi is a PLC programming and engineering environment widely used in factory automation projects. The version on this page is packaged for straightforward installation on a standard engineering PC. The screenshots below walk you through every dialog so nothing is left to guesswork.

Key Capabilities of Nachi Robots FD on Desk II Download

  • Integrated function-block and structured-text editors
  • Tag-based project structure with reusable code blocks
  • Online monitoring and live modification of ladder logic
  • Diagnostics dashboard for I/O and module status
  • Built-in simulator for offline logic validation
  • Firmware version management and controller compatibility checks

System Requirements

  • Windows 10/11 64-bit (Professional recommended)
  • 8 GB RAM minimum, 16 GB recommended
  • 20–50 GB free disk space depending on installed options
  • 1920×1080 display or larger

Installation Notes

  1. After installation, re-enable antivirus protection and add the program folder to the allowed list if your policy requires it.
  2. Extract the downloaded archive with the password shown at the bottom of this page, using a recent version of WinRAR or 7-Zip.
  3. Temporarily disable antivirus and Windows Defender real-time protection — installers that copy licensed components are frequently false-flagged.
  4. If a controller or robot connection will be used, allow the software through the Windows firewall when prompted.
  5. Do not connect any USB license dongle until the setup program has finished completely.

Frequently Asked Questions

Is a license dongle required?
Licensing is typically node-locked or dongle-based; a trial mode is usually available for evaluation.

Which controller series is supported?
Check the release notes for the exact firmware matrix; each major version supports a defined controller range, and newer firmware usually requires a newer engineering tool.

Does it run in a virtual machine?
Yes, VMware or VirtualBox work for programming and testing; enable nested acceleration if you use the built-in simulator.

Can older projects be opened?
Projects migrate forward release by release. Keep a backup copy of the original project before converting it to a newer version.

Run HASPUserSetup.exe with administrator rights.
To the end of the installation.

Nachi Robots FD on Desk II — Frequently Asked Questions

Sequence
Nachi Robots FD on Desk II — Frequently Asked Questions

Sequence

Install FDonDeskII with administrator privileges.
Installed by default until the end.

Nachi Robots FD on Desk II — Frequently Asked Questions

Sequence
Nachi Robots FD on Desk II — Frequently Asked Questions

Sequence
Nachi Robots FD on Desk II — Frequently Asked Questions

Sequence
Section divider line

➤ Step2 ✱✱ Activation

①  Run the activation tool as administrator.
②  Enter your serial number, or import your license file.
③  Click the “Activate” button.

Section divider line

Installation steps sequence diagram

Enter your activation key (from official, agent, or other seller).
Or import the license file.
This usually activates it.
If needed, restart your computer once.


Installation steps sequence diagram
Section divider line

➤ Step3 ✱✱ Reset computer

Installation steps sequence diagram

➤ Step4 ✱✱ Running App

Section divider line

Installation steps sequence diagram
Nachi Robots FD on Desk II — Frequently Asked Questions

Sequence
Section divider line

If you have problems installing, email us.
We can help you remotely and fix the problems.

Section divider line

Installation steps sequence diagram

Tips from Real Projects

On a twelve-robot welding line, Nachi Robots FD on Desk II offline paths held so well that commissioning was mostly calibration and safety walks. The differences came from small things: correct load data on every tool, approach angles planned away from singularity regions, and programs released with a one-page commissioning sheet. If simulation and the real cell drift apart, check workpiece calibration first — nine out of ten offline-to-online mismatches are a frame issue, not the program.

Files are delivered on our partner site up-der.com — a free account is required for some downloads.


WinRAR Download